3. Collect the MaterialsThe
villagers are responsible for making the bricks and collecting sand and stones for the
concrete and mortar. These should be gathered and piled near the well site before the
digging begins. The sand and stones for making the top slab need to be collected when the
top slab is to be built, usually in August or September.

Collect the sand, stone, clay and bricks before the well is dug.